PQube®

Power Standards Lab

C.N. Rood - Brussels (Belgium)

Building Entrance
setup v8


 
Meters

MeterValue
L1-N235,2V
L2-N235,7V
L3-N234,3V
N-E0,8V
L1-L2407,1V
L2-L3407,8V
L3-L1406,5V
L1 Amp7,362A
L2 Amp7,011A
L3 Amp18,580A
N Amp15,693A
Frequency49,957Hz
Voltage THDMax1,60%
L11,40%
L21,40%
L31,60%
THD-AMax43,50%
L141,30%
L243,50%
L320,00%
L1 FlickerPinst0,00
PST0,05
PLT0,05
L2 FlickerPinst0,00
PST0,07
PLT0,07
L3 FlickerPinst0,00
PST0,04
PLT0,04
IEC Zero Sequence V0,30%
IEC Negative Sequence V0,10%
IEC Zero Sequence I46,70%
IEC Negative Sequence I34,20%
L1-N Voltage Fundamental235,1V0deg
L2-N Voltage Fundamental235,7V-120deg
L3-N Voltage Fundamental234,3V120deg
L1 Current Fundamental7,362A30deg
L2 Current Fundamental6,413A-109deg
L3 Current Fundamental18,291A121deg
User Counter
(since 2015/02/03)
0
 
Energy

MeterValue
PowerTotal7,13kW
L11,55kW
L21,49kW
L34,26kW
Apparent PowerTotal7,75kVA
L11,90kVA
L21,65kVA
L34,34kVA
Reactive PowerTotal3,02kVAR
L11,13kVAR
L20,72kVAR
L30,87kVAR
True Power FactorTotal0,92
L10,83
L20,90
L30,98
Energy
(since 2015/02/03)
99,761MWh
Apparent Energy
(since 2015/02/03)
124,609MVAh
Reactive Energy
(since 2015/02/03)
69,897MVARh
Carbon
(since 2015/02/03)
32,333Mg
Carbon Rate2,31kg/h
Peak RMS Current
(since 2015/02/03)
1 cycle129,996Arms
1 minute37,922Arms
15 minute37,077Arms
Peak Power
(since 2015/02/03)
1 cycle31,99kW
1 minute16,82kW
15 minute14,58kW
Peak Apparent Power
(since 2015/02/03)
1 cycle46,03kVA
1 minute17,21kVA
15 minute15,08kVA
 
Harmonic H3

MeterValue
L1 Harmonic H30,8V122deg
2,103A195deg
L2 Harmonic H30,3V66deg
1,732A184deg
L3 Harmonic H30,5V158deg
1,217A231deg
 
Present Harmonic of Interest: 3
 
Internal Sensors

MeterValue
Battery voltage3,68V
Battery current0,02A
Battery cycles
(since 2012/09/11)
80
Status55
PQube Memory Usage71%
 

Data from the PSL PQube® by www.PowerStandards.com